Ground improvement work | Constructing high-strength piles with no soil quality impact using the Pure Pile method.
We propose the Pure Pile method, which forms pile-like reinforcement using high-strength cement milk without mixing with locally generated soil, preventing differential settlement without being affected by soil quality.
To safely maintain a building, it is essential to accurately assess the ground bearing capacity of the construction site and to carry out appropriate ground reinforcement work to prevent differential settlement. The Pure Pile method proposed by Geotech Co., Ltd. is an advanced ground reinforcement technology that forms pile-like reinforcement bodies by displacing the ground laterally with a conical excavation head while replacing it with high-strength cement milk. The main feature is that it does not mix the locally generated soil with cement. This allows it to perform consistently high strength and quality as planned, without being affected by soil conditions, including humus layers, in various ground types. By evenly distributing a large number of reinforcement bodies with a design pile diameter of 20 cm, it disperses and supports the building load, achieving high vertical bearing capacity and eliminating the risk of structural settlement in advance. Additionally, due to the construction structure that generates almost no residual soil, it reduces the costs of soil disposal and site load. At Geotech, under an ISO-certified quality management system, specialized construction engineers measure and manage data in real-time, providing reliable and trustworthy construction services.
- Company:ジオテック
- Price:Other